The short answer: Do not compare commercial solar quotes on the last line. First make them match. Check the solar size, the usable battery size, which loads are backed up, and what is left out. Then check who gets approval from your power supplier, who issues the CoC, what the warranties cover, and if the price is a full build or only parts.

Power bills keep going up, and diesel for the generator costs a lot. So you get two or three quotes, and the numbers are far apart. This guide shows you how to line them up.

Key takeaways
  • Same inputs first. Every company should see the same bills and the same site.
  • Same units. Solar in kWp, batteries in usable kWh, not "backup hours".
  • Look for what is left out. Roof work, cables and approvals are often where prices differ.
  • Papers are part of the job. Your supplier must approve the system in writing before it connects (NERSA Net-Billing Rules), and only a registered installation electrician or a master installation electrician may issue the CoC (Electrical Installation Regulations, 2009).
  • Buy, rent and PPA are not the same product. Do not compare a monthly fee with a price to buy.

What is a commercial solar quote?

A commercial solar quote is a written price to put solar, and often batteries, on a business site. It should say what will be built, what parts will be used, what work is in the price, and what is not.

Many quotes are from EPC companies. EPC stands for engineering, procurement and construction: one company plans the system, buys the parts and builds it. Some quotes are only for parts, or only for labour. That alone can make prices look far apart.

For what panels cost on their own, read our guide to solar panel prices for business. This guide is about how to tell if two full quotes are for the same job.

What should you send every solar company before they quote?

If one company saw your bills and another only saw a photo of your roof, the quotes will not match. Give every company the same pack:

  • 12 months of power bills, with the tariff name on them.
  • Half-hour meter data, if your supplier can provide it.
  • Your diesel spend, if you run a generator.
  • Your working hours, and the hours when you use the most power.
  • A list of the loads you want kept on when the grid is down, if any.
  • Roof or ground details, and building plans if you have them.

Our solar feasibility study checklist covers this step in more detail. A quote with no site visit is often a guess.

How do you line up two or more quotes?

Copy this table and fill in one column for each quote. If a box stays empty, ask the company to fill it in, in writing.

What to checkWhat to askQuote AQuote B
Solar sizeHow many kWp? How many panels, and what kind?
Inverter kW ACWhat make and size in kW AC? Is it on your power supplier's approved list?
DC:AC ratioWhat is the DC:AC ratio, and why does it fit this site?
BatteriesHow many kWh are usable, not just on the label?
BackupWhich loads stay on? For how long, at what load?
Mounting and roofIs roof repair, a roof check or a ground frame in the price?
Structural sign-offIs an engineer roof or structural sign-off in the price?
Electrical workAre cables, trenching, the board and any upgrades in?
Electrical engineer sign-offIs electrical engineer sign-off in the price?
ApprovalsWho applies for supplier approval and SSEG registration? Are fees in? What happens if it is refused?
CoCWho issues the Certificate of Compliance? Are they a registered installation electrician or a master installation electrician?
MonitoringWho owns the monitoring account, and for how long is it included?
MaintenanceWho services the system after handover, and on what terms?
WarrantiesPanel, inverter, battery and workmanship. How many years? Who honours each one in South Africa?
Who builds itTheir own crew, or a subcontractor?
How you payBuy, rent or PPA? What is the total over the full term, including VAT?
Payment and timingWhat are the payment milestones, the build time, and how long is the quote valid?
What is left outAsk for a written list of exclusions.

Once every row is full, you can see the real gap.

Which line items change the price the most?

Two quotes can use the same panels and still be far apart, because of the work around the panels. Look for these lines.

Roof and frames

An old roof may need repair before panels go on. Some roofs need a check by an engineer. Ask if this is in the price, or if it will come later as an extra. Our guide to roof and asbestos checks covers what to look for on a business roof, including asbestos.

The DC:AC ratio

kWp is only the DC side, the panels. A quote with more panels on a smaller inverter can look cheaper per kWp. Ask the bidder to state the inverter size in kW AC, and to explain why the DC:AC ratio fits the site's load.

Cables, trenching and the main board

Panels far from the main board need long cables. Some sites need trenching, or a new or bigger board. Ask each company to list these.

Access and shutdowns

Some sites need scaffolding, a crane, work after hours or a short shutdown. Ask who plans this, and if it costs extra.

Monitoring and training

Ask if monitoring is set up, for how long, who owns the account, and if your team will be shown how to use it.

How do you compare batteries and "backup" in a quote?

Battery lines are where quotes are often hardest to compare. Our commercial battery storage guide explains peak shaving, backup and what a battery quote should show.

A battery has a size on its label, in kWh. But you can not always use all of it. Most batteries keep some charge in reserve to last longer. So ask each company for the usable kWh, not just the label size.

Then ask what "backup" means in that quote:

  • Which loads stay on when the grid is down? The whole site, or only some circuits?
  • For how many hours, and at what load?
  • Will the batteries also cut costly evening power each day, or only give backup?
  • If you run a generator, how will the batteries and the generator work together?

"4 hours backup" with no load named can not be compared. Four hours for a few lights is not four hours for the whole site.

Which papers and approvals should a quote cover?

Approval from your power supplier

Your power supplier is Eskom, or your municipality if it sells you power. Under the NERSA Net-Billing Rules, the supplier may not let a system connect without an application, any connection charges, a signed agreement and written approval to connect. It must answer within 30 days of a full application (NERSA Net-Billing Rules, clauses 4.2 and 4.5).

Registration is also required even if the system does not export. NERSA says systems of 100 kW or less register with the distributor (Eskom or the municipality), and systems above 100 kW register with NERSA (NERSA media statement, 2 February 2026). Eskom says you must register a system below 100 kVA even if you do not export (Eskom Distribution, small-scale embedded generators). Our guide to SSEG registration explains the steps in Gauteng.

Some suppliers also want an inverter from an approved list. The City of Cape Town, for example, asks for a City-approved inverter, and the installer must apply before the system goes in (City of Cape Town). Ask each company which approvals they will do, and if the fees are in the price.

Certificate of Compliance (CoC)

Under the Electrical Installation Regulations, 2009, only a registered installation electrician or a master installation electrician may issue a Certificate of Compliance. No one may connect a new installation to the supply until a registered person has inspected and tested it and a CoC has been issued (Electrical Installation Regulations, 2009, regulations 8 and 9).

So ask: who will issue the CoC, are they a registered installation electrician or a master installation electrician, and is it in the price? CoC and engineering sign-off also matter to insurers (Aon South Africa, Solar fire risks).

PV GreenCard

A PV GreenCard is an as-built report from a certified installation company, under a programme run with SAPVIA, the solar industry body. It lists the parts, the design and expected performance (PV GreenCard). Certified companies must be registered electrical contractors. The PV GreenCard directory is updated monthly, and you can also check SAPVIA membership. It is a useful extra, but it does not replace the CoC or supplier approval.

What should you check in the warranties?

There is more than one warranty in a solar quote. Ask for each one in writing:

  • Panel product warranty: faults in the panel itself.
  • Panel performance warranty: how much power the panels should still make after a set number of years.
  • Inverter and battery warranties: check the years, and any limit on battery use.
  • Workmanship warranty: the build itself. This comes from the installer, not the maker of the parts.

A long warranty only helps if someone in South Africa will stand behind it. So ask where each main part comes from, and who you call if it fails. A known local importer or wholesaler with stock and support in South Africa can make that easier. TIA Energy works with Herholdt's Group, a South African importer and wholesaler of electrical and solar products.

Also check that the parts in the quote are the parts that will be fitted. If a part may be swapped, ask for it to be the same or better, in writing.

Who will actually build the system?

Ask each company who does the work on site: their own crew, or a subcontractor? You should know who is responsible if something goes wrong. Also ask who cleans and services the system after the build, and on what call-out terms. Our maintenance checklist and our guide on how to choose a solar company in Gauteng have more questions to ask a supplier.

Questions to send each bidder

You can paste these into an email and send the same list to every company:

  • What tariff rate did you assume each solar unit replaces?
  • What is excluded from this price, in writing?
  • Who files the SSEG application, are the fees in the price, and what happens if it is refused?
  • Who issues the CoC, and are they a registered installation electrician or a master installation electrician?
  • What is the usable battery kWh, the power in kW, and which loads are backed up?
  • What is the inverter kW AC, and why is this DC:AC ratio right for the site?
  • How long is the workmanship warranty, and who honours it in South Africa?
  • Who maintains the system after handover, and on what call-out terms?

What if one quote is a rental or a PPA?

Then you are not comparing the same thing. A price to buy is paid once. A rental is a monthly fee. With a PPA (power purchase agreement) you pay for each unit the system makes. Work out what you pay over the full term, next to your power tariff. Our buy, rent or PPA guide lists what to check in each kind of deal.

Section 12B tax relief applies only when the business owns the system, not when you rent it or buy the power under a PPA. Our solar funding guide explains the funding options in more detail.

How do you tell if a quote is worth it?

A good quote shows what the system will save, based on your own bills. Check:

  • Does it use your real tariff, including peak and standard hours?
  • Does it count power sent to the grid as if it were worth the same as power you buy?
  • If you run a generator, does it show the diesel you may save?

We do not give a price per kW or a payback figure here. Both depend on your site. For large plant figures, see our guide to cost per MW. Be careful of any savings number with no workings behind it.

How does TIA quote?

TIA Energy is a commercial solar company based in Gauteng. We plan, build and look after solar and batteries for business sites. See our services and maintenance pages, or try the savings calculator. Our process starts with a 15 minute chat with Adam, then a site check if solar makes sense, then a plan.

We start with your bills and diesel spend, so the system fits what your site uses. See finished work, such as Honey Crest Mall and Greenside, on our projects page.

Frequently asked questions

How do I compare commercial solar quotes?

Line them up item by item: solar size in kWp, usable battery kWh, backed up loads, and what is left out. Then check approvals, the CoC, warranties and who builds it.

Why are solar quotes so far apart?

Most of the time the scope is not the same. One quote may leave out roof work, cables, approvals or batteries. Another may be a rental or a PPA.

What does a solar EPC quote include?

EPC means one company plans, buys the parts and builds. A full EPC quote should cover design, parts, building, testing, the CoC and supplier approval. Ask in writing what is left out.

Should I take the lowest solar quote?

Only if it covers the same work. Compare the scope first, then the price.

Who issues the CoC for a solar system?

Only a registered installation electrician or a master installation electrician may issue a CoC under the Electrical Installation Regulations. Ask who will issue it, and if it is in the price.

Is a PV GreenCard the same as a CoC?

No. It is an as-built report that sits next to the CoC. It does not replace the CoC or written approval from the power supplier.

How much does a commercial solar system cost?

It depends on your site, your power use and your tariff. We do not give a price per kW or a payback figure here. Our guide to cost per MW covers large plant figures. A good quote is built from your own bills and a site check.

Can TIA review quotes I already have?

Send a recent bill through our bill check. We will say what a full scope for your site should include. That gives you a clear list to hold other quotes against.

Want a quote you can compare?

Send us a recent power bill. We will look at your tariff and your use, and tell you what a full scope for your site should cover.

Get a free bill check

Or contact us if you would rather talk it through.

Sources

blog author avatar

Adam Palmer

Adam Palmer writes about solar power, energy storage and water in Africa.

LinkedIn logo icon
Back to Blog
Not sure where to start?

Book a quick chat

Adam calls you for 15 minutes. Tell him what you pay for power and diesel, and what your site needs.

Book a quick chat