A mine or a heavy plant does not buy solar because the words "solar mining services" are popular. It buys solar and batteries if the system cuts a real electricity tariff, cuts hours on a diesel generator, or keeps a pump or process running at a known cost. The work starts with the bill and the diesel log, not with a panel brochure.
TIA Energy is based in Gauteng and designs commercial solar and battery systems for sites across South Africa, including industrial and pumping work. We do not claim a mine as a published TIA case study on this page. The projects we have published are listed on our projects page.
Where does the power go on a mine or a heavy plant?
The largest loads on a mine or a process plant are often mills, crushers, conveyors, furnaces, compressors, ventilation and large pumps. Some of those loads run around the clock. Some peak in the day. Offices, workshops, camps, change rooms and lighting are smaller, but they still sit on the same tariff and the same backup diesel.
Solar produces in the day. It is a good match for daytime process loads, workshops, pumping into storage, and any shift that already uses a lot of power while the sun is up. Night loads, safety systems and backup still need a plan: batteries for selected circuits, or less diesel on the generator, or both.
A Middelburg, Witbank or other Mpumalanga industrial site is a good example of the same test, even if the search term is "solar mining services Middelburg". The town is not the product. The tariff, the load shape and the diesel hours are the product.
How electricity tariffs and diesel shape the case
If the site buys from Eskom, the 2026/27 Eskom direct increase approved by NERSA is 8.76% from 1 April 2026. If the site buys from a municipality, the average municipal increase is 9.01% from 1 July 2026 (NERSA ERTSA media statement). Your actual cents per kWh depend on the tariff name on the invoice, including any time-of-use peak window.
Diesel is a separate line. From 4 November 2026, the official Gauteng wholesale price is 3,085.670 cents a litre (R30.86) for 0.05% sulphur diesel and 3,160.070 cents a litre (R31.60) for 0.005% sulphur diesel (CEF press release). Those are wholesale list prices, not pump prices. A temporary general fuel levy cut on diesel is in that price structure only until 1 December 2026. For how the monthly price is set, see our guide to the diesel price for generator users. For a worked cost per kWh, see the live guide to solar versus diesel.
TIA does not sell or hire generators. The aim of solar and batteries on a heavy site is often to cut generator hours and expensive grid units, not to replace a generator sales contract.
What to ask a company that offers solar mining services
Ask for a model based on 12 months of invoices and a diesel log, not a generic "mining solar" rate. Ask which loads will take solar in the day, which loads need batteries, and which loads stay on the grid or on diesel.
If the system will connect to the grid, ask who will handle SSEG registration. Grid-connected systems of 100 kW or less register with the distributor. Systems above 100 kW register with NERSA (NERSA, 2 February 2026). If you buy the system, ask whether Section 12B may apply, and take that to your tax practitioner (SARS IT39). See our Section 12B guide.
Ask about land, dust, security and maintenance. A plant next to a dusty process needs a cleaning and inspection plan. See our commercial solar maintenance checklist for the kind of work involved, even if your site is not in Gauteng.
For a structured start, use the solar feasibility study checklist.
How batteries and water pumping fit
Batteries are not an add-on slogan. They move midday solar into a peak tariff window, they carry selected night or safety loads, and they cut diesel starts. Size them from the circuits you must keep, not from a round number on a quotation.
Water is often a large part of a mine or plant load: process water, dust suppression, camps and, on some sites, borehole or transfer pumping. Solar can fill tanks in the day. Batteries can run a shorter night pressure load. Storing water is often cheaper than running a very large pump from a very large battery after dark. For pumping design, see water pumps for business and farms and the live borehole water use licence guide.
On TIA's Heilbron site, two borehole pumps run from one solar array: just over 8,000 litres an hour from the first, and 25,000 litres an hour from a 7.5 kW second pump that runs fully on solar. That is a pumping example, not a mine. Honey Crest Mall in Randpark Ridge uses solar plus batteries. A Greenside Johannesburg business uses solar. Those are the published TIA jobs we can name. We have not published a mine project on this page.
Frequently asked questions
What are solar mining services?
They are solar and, in a serious design, battery systems built around a mine or heavy industrial load. The useful test is your tariff, your daytime use and your diesel hours, not the label on the webpage.
Can solar run a whole mine?
Often no, and a honest designer will say so. Many process loads run day and night, and some are far larger than a rooftop or a single ground array can cover. Solar and batteries usually cut a share of the bill and a share of generator hours. A feasibility study should show which share.
Do mines in Middelburg or Mpumalanga need a local installer?
You need a company that will design to your Eskom or municipal tariff, register the system correctly, and maintain it. TIA Energy is based in Gauteng and works on sites across South Africa, including industrial areas such as Middelburg. We do not claim a Middelburg office or Middelburg staff on this page.
Do I need batteries as well as solar?
Solar helps with daytime units. Batteries help if you have a peak window, a night circuit you must keep, or a plan to run less diesel after sunset.
Talk to us about a heavy-site solar and battery plan
If you can share 12 months of invoices and a diesel log, we can look at solar, batteries and pumping on the site. Start on our services page, or send the bills through the bill check.
Sources
- NERSA ERTSA media statement (8.76% from 1 April 2026 for Eskom direct; 9.01% average from 1 July 2026 for municipalities): https://www.nersa.org.za/files/files/2026/03/MediaStatement-NERSAapprovesEskomRetailTariffsandStructuralAdjustmentapplicationfor2026-27.pdf
- NERSA SSEG media statement, 2 February 2026: https://www.nersa.org.za/files/files/2026/02/UpdatedMediaStatement-NERSAclarifiesregulatoryrequirementsforSmallScaleEmbeddedGeneration.pdf
- CEF press release, wholesale diesel from 4 November 2026: https://cefgroup.co.za/wp-content/uploads/2026/11/Press-Release-30-October-2026-Change-04-November-2026.pdf
- SARS IT39, Section 12B: https://www.sars.gov.za/wp-content/uploads/Ops/Guides/Legal-Pub-Guide-IT39-Guide-on-the-Allowances-and-Deductions-Relating-to-Assets-Used-in-the-Generation-of-Electricity.pdf
- Live TIA projects page: https://tia-energy.com/projects