Rows of solar panels on the roof of Honey Crest Mall in Randpark Ridge, Gauteng

Solar for Centurion Businesses on Tshwane Tariffs

November 12, 2026•3 min read

By Adam Palmer, TIA Energy. Adam Palmer writes about solar power, energy storage and water in Africa. Last updated: 12 November 2026. This page is for businesses in Centurion. TIA Energy is based in Gauteng and works on sites in Centurion and across South Africa. We do not claim a Centurion office, a Hennopspark shop, or Centurion staff on this page.

Centurion is part of the City of Tshwane. It is not part of the City of Johannesburg, even though Midrand sits just to the south. That boundary changes your electricity tariff, your SSEG registration, and the numbers that belong in a solar and battery quote.

Why the metro boundary matters in Centurion

A business park along the N1 can look like one commercial belt from Midrand through Centurion. The bills are not the same. A Centurion site is usually on City of Tshwane electricity. A Midrand site may be on City Power or on Eskom, depending on the stand. If a quote uses a Johannesburg or Midrand rate for a Centurion site, the savings figure is the wrong figure.

Centurion's commercial fabric is also its own. Highveld, Hennopspark, the Centurion central business area and the office and light-industrial parks around the N1 have a lot of weekday daytime loads: offices, warehousing, motor and logistics firms, and retail. Solar fits that daytime shape. Batteries are for evening use, peak windows, and shorter backup so you run less diesel.

Keyword Planner shows only a handful of "Centurion" solar searches, each at about 10 searches a month (for example solar solutions centurion). The business case still turns on the Tshwane tariff, not on the size of the search term.

The Tshwane tariff a Centurion business actually pays

From 1 July 2026, NERSA's Tshwane decision recommended 401.80 c/kWh for small single-phase conventional commercial supplies, with a basic charge of R1,000.00 a month, and 405.80 c/kWh for three-phase conventional commercial supplies, with a basic charge of R1,200.00 a month (NERSA, City of Tshwane reasons for decision, July 2026). The energy rates rose while the basic charges were cut, so more of the bill now sits on each unit you use. Confirm the line on your invoice, and whether VAT is extra.

If your Centurion site is a larger plant or a time-of-use customer, do not use those small-commercial lines. Use the tariff name on the bill. Agricultural land in Tshwane has its own recommended energy charge of 402.02 c/kWh in the same decision.

Solar, batteries and registration in Centurion

Grid-connected systems must be registered. Facilities of 100 kW or less register with Tshwane as the distributor. Facilities above 100 kW register with NERSA (NERSA, 2 February 2026). If you own the system, Section 12B may allow a first-year deduction for qualifying solar. Confirm that with your tax practitioner (SARS IT39).

TIA Energy will model a Centurion site on Tshwane rates, not on a Johannesburg average. We have not published a Centurion project on this page. Our published Gauteng work includes Honey Crest Mall in Randpark Ridge (solar plus batteries) and Greenside in Johannesburg. See services, projects, and the bill check.

Frequently asked questions

Is Centurion on City Power or Tshwane?

Centurion is in the City of Tshwane. Most business sites should see Tshwane as the supplier on the bill. If your invoice says Eskom, use Eskom rules instead.

Can I use a Midrand solar quote for a Centurion site?

Not without changing the tariff. Midrand is in the City of Johannesburg and may be on City Power or Eskom. Centurion is usually on Tshwane.

Do Centurion businesses need batteries?

If you only use power in the sun, solar may do most of the energy work. If you have evening use, a peak rate, or diesel backup, batteries should be part of the design.

How do I get a Centurion figure?

Send 12 months of invoices through the bill check.

Sources

blog author avatar

Adam Palmer

Adam Palmer writes about solar power, energy storage and water in Africa.

LinkedIn logo icon
Back to Blog
Not sure where to start?

Book a quick chat

Adam calls you for 15 minutes. Tell him what you pay for power and diesel, and what your site needs.

Book a quick chat