Solar for Ekurhuleni and East Rand Businesses
By Adam Palmer, TIA Energy. Adam Palmer writes about solar power, energy storage and water in Africa. Last updated: 12 November 2026. This page is for businesses in the City of Ekurhuleni and the wider East Rand, including Kempton Park, Boksburg, Benoni, Germiston, Springs, Alberton and Edenvale. TIA Energy is based in Gauteng and works on East Rand sites and across South Africa. We do not claim an Ekurhuleni office or East Rand staff on this page.
The East Rand is one of South Africa's main industrial and logistics belts. OR Tambo, the manufacturing stands around Boksburg, Germiston and Benoni, and the warehouse parks towards Springs and Alberton all use large amounts of weekday power. Solar can cut the units you buy in the day. Batteries can cut peak or evening units and reduce diesel run time for backup. The numbers only work if they use an Ekurhuleni tariff, not a Johannesburg or Tshwane one.
What Ekurhuleni business tariffs mean
The City of Ekurhuleni applied for an average 9.01% increase for 2026/27. NERSA approved tariffs for implementation from 1 July 2026 (NERSA, City of Ekurhuleni reasons for decision). In Table 8 of that decision, Tariff A (Business) has an approved energy charge of R4.46 per kWh in both the high demand and low demand seasons, with an approved monthly basic charge of R84.81 for a single-phase point of supply and R38.13 for a three-phase point of supply.
Check your invoice with care. The same NERSA table shows that the City's implemented 2025/26 business rates were not identical to the prior NERSA-approved column. The tariff name on your bill comes first. Ekurhuleni also has other commercial and industrial tariffs, including Tariff B and Tariff C, which can include demand charges or seasonal energy rates. If you are on a time-of-use tariff, the expensive window is where batteries earn their place.
Do not use a Tshwane 401.80 c/kWh line, or a City Power average, to judge an Ekurhuleni site.
Solar and batteries for East Rand loads
Many East Rand sites have long daytime production or logistics shifts. That is a good match for rooftop or, where the structure allows, carport or ground-mount solar. Cooling, compressed air, packing lines and warehouse lighting often continue later in the day. A battery can carry part of that load when the tariff is high, or when you would otherwise start a generator.
Grid-connected systems of 100 kW or less register with the City of Ekurhuleni. Systems above 100 kW register with NERSA (NERSA, 2 February 2026). Our SSEG guide covers Ekurhuleni with Johannesburg and Tshwane. If you buy the system, ask your tax practitioner about Section 12B (SARS IT39).
TIA Energy has not published an Ekurhuleni case study on this page. Our published Gauteng work includes Honey Crest Mall in Randpark Ridge (solar plus batteries) and Greenside in Johannesburg, which are City of Johannesburg sites, not East Rand sites. See projects and services. To model an Ekurhuleni bill, use the bill check.
Frequently asked questions
Are Kempton Park, Boksburg and Benoni all on the same tariff?
They are in the same metro, but they are not all on the same tariff class. A small business on Tariff A is not billed like a large industrial time-of-use customer. Read the tariff name on the invoice.
What is the Ekurhuleni business rate per kWh for 2026/27?
NERSA's approved Tariff A (Business) energy charge is R4.46 per kWh for both seasons. Confirm that this is your tariff, and whether VAT is extra, before you use the figure.
Do East Rand factories only need solar, or also batteries?
Solar helps in the day. Batteries help if you have a peak charge, evening production, or diesel backup. Many industrial designs need both.
How do I start on an Ekurhuleni site?
Send 12 months of invoices through the bill check.