Solar panels on the roof of Honey Crest Mall in Randpark Ridge, Gauteng

Solar for Midrand Businesses: City Power or Eskom

November 12, 2026•4 min read

By Adam Palmer, TIA Energy. Adam Palmer writes about solar power, energy storage and water in Africa. Last updated: 12 November 2026. This page is for Midrand businesses, including office, logistics and business-park sites. TIA Energy is based in Gauteng and works on Midrand sites and across South Africa. We do not claim a Midrand office or Midrand staff on this page.

Midrand is inside the City of Johannesburg, but that does not tell you who sells your electricity. Some Midrand stands are on City Power. Some are on Eskom. A quote that uses the wrong supplier will use the wrong tariff, the wrong peak times, and the wrong SSEG desk.

City Power or Eskom: read the Midrand invoice

Check the supplier name on a recent bill or prepaid receipt. Do not guess from the suburb alone. Local reporting has described some Midrand areas, including parts of Vorna Valley, as being on an Eskom-managed network rather than City Power (Midrand Reporter, 21 May 2024). That article is about a local network fault, not about tariffs, but it is a reminder that Midrand is split. Confirm your own stand.

If you are on City Power, the City of Johannesburg announced an 8.63% average electricity increase from 1 July 2026 (City media statement, 10 June 2026). City Power business tariffs differ by size and may include seasonal energy blocks, network charges and surcharges. Use the schedule that matches the tariff name on your bill, or send the invoices to us.

If you are on Eskom, your tariff may be a business rate or a time-of-use rate such as Megaflex or Miniflex. For Megaflex sites below 500 V and within 300 km, the 2026/27 winter peak energy charge is 739.28 c/kWh excluding VAT (Eskom Tariff Booklet 2026/2027, page 13). Batteries have a clear job on a peak rate like that.

Midrand also sits next to Centurion. Centurion is in the City of Tshwane. A business park on the wrong side of that boundary is on a different metro and a different SSEG process.

What Midrand commercial sites tend to need

Midrand has office parks, logistics and light industrial space, including the Waterfall and Grand Central belt and the parks along the N1. Many of those sites use power all day, which suits solar. Late shifts, cold rooms, charging of site equipment, and evening office use are the reason to add batteries. Diesel backup, where you already have it, is usually the expensive way to cover a long gap. We do not invent a Midrand diesel figure here. A proper model uses your own run hours and fuel slips.

Grid-connected systems of 100 kW or less register with City Power or with Eskom, matching the supplier on the bill. Systems above 100 kW register with NERSA (NERSA, 2 February 2026). Section 12B, if you own a qualifying system, is a tax question for your practitioner (SARS IT39).

TIA Energy has not published a Midrand project on this page. Our published Johannesburg-area work includes Honey Crest Mall in Randpark Ridge (solar plus batteries) and Greenside. See projects, services, and the bill check.

Frequently asked questions

Is Midrand on City Power?

Some sites are. Some are on Eskom. Read the invoice. Do not assume the whole of Midrand is municipal.

How is Midrand different from Centurion?

Midrand is in the City of Johannesburg. Centurion is in the City of Tshwane. The tariff, the registration desk and the bill layout can all differ.

Do Midrand businesses need batteries as well as solar?

If you have evening use, a time-of-use peak, or diesel backup, yes, the design should include batteries. Solar alone covers the sun hours.

How do I get a Midrand quote that uses the right tariff?

Send 12 months of invoices through the bill check. We will use the supplier and tariff on those invoices.

Sources

blog author avatar

Adam Palmer

Adam Palmer writes about solar power, energy storage and water in Africa.

LinkedIn logo icon
Back to Blog
Not sure where to start?

Book a quick chat

Adam calls you for 15 minutes. Tell him what you pay for power and diesel, and what your site needs.

Book a quick chat